We had an outage from approximately 21:31 PDT -0700 to 22:16 PDT. Currently we have a cross connect from coresite to HE.net in another facility. We are told that coresite had problems with their core switches. We have gathered quotes for alternate bandwidth but had not made a final decision. We will confirm beforehand that whatever cross connect we get for this additional bandwidth will not be dependent on coresite’s network infrastructure.